[Federal Register Volume 64, Number 2 (Tuesday, January 5, 1999)]
[Notices]
[Pages 491-496]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-67]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. EG98-81-000, et al.]


Indiantown Cogeneration, L.P., et al.; Electric Rate and 
Corporate Regulation Filings

December 23, 1998.
    Take notice that the following filings have been made with the 
Commission:

1. Indiantown Cogeneration, L.P.

[Docket No. EG98-81-000]

    On December 15, 1998, Indiantown Cogeneration, L.P. (Indiantown) 
filed a notice of change in facts to reflect a certain departure from 
the facts the Commission relied upon in granting exempt wholesale 
generator status to Indiantown.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. The United Illuminating Company Wisvest-Connecticut, LLC 
Fitchburg Gas and Electric Light Company

[Docket Nos. EC99-17-000 and ER99-977-000]

    Take notice that on December 21, 1998, the United Illuminating 
Company (United Illuminating), Wisvest-Connecticut, LLC (Wisvest-
Connecticut) and Fitchburg Gas and Electric Light Company (Fitchburg) 
(the Applicants) jointly and/or individually submitted for filing, 
pursuant to Sections 203 and 205 of the Federal Power Act, and Parts 33 
and 35 of the Commission's regulations, applications and rate schedules 
in connection with the divestiture by United Illuminating of 
substantially all of its fossil electric generation assets by sale to 
Wisvest-Connecticut, all pursuant to a series of agreements dated 
October 2, 1998. In addition, Fitchburg seeks approval of the transfer 
to United Illuminating, for sale to Wisvest-Connecticut, of Fitchburg's 
4.5% interest in the New Haven Harbor Station, one of the electric 
generation assets that United Illuminating is divesting.
    In addition to approval of the disposition of the transmission 
facilities associated with the divestiture of the generation assets, 
United Illuminating and Wisvest-Connecticut seek approval for United 
Illuminating's assignment of certain wholesale power sales agreements 
to Wisvest-Connecticut. Certain Applicants further filed the following 
agreements: (1) a Power Supply Agreement pursuant to which Wisvest-
Connecticut will supply wholesale transition service and related 
ancillary services to United Illuminating; (2) a Purchased Power 
Agreement pursuant to which United Illuminating will transfer the 
output associated with its interest in the fossil generation assets to 
Wisvest-Connecticut in the event the divestiture transaction does not 
close by 12:01 a.m., April 1, 1999; and (3) an Interconnection 
Agreement providing for the interconnection of the generating 
facilities and for various physical arrangements at the sites in 
question.
    Copies of the entire filing have been served on the regulatory 
agencies in the State of Connecticut, Commonwealth of Massachusetts and 
State of New Hampshire.
    Comment date: January 20, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

3. Gauley River Power Partners, L.P.

[Docket No. EG99-17-000]

    Take notice that on December 3, 1998, Gauley River Power Partners, 
L.P. filed a Notice of Withdrawal of Application for Determination of 
Exempt wholesale Generator Status.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

4. PDC-El Paso Milford LLC

[Docket No. EG99-29-000]

    Take notice that on November 24, 1998, PDC-El Paso Milford LLC (the 
Applicant) filed an application for status as an exempt wholesale 
generator status pursuant to Part 365 of the Commission's regulations.
    The Applicant will construct and own an eligible generating 
facility (a natural gas-fired electric generation facility, including 
ancillary and appurtenant structures, with a nominal average annual 
output of 544-MW) to be located on a site in the City of Milford, 
Connecticut.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

5. CH Resources, Inc.

[Docket No. EG99-30-000]

    Take notice that on December 7, 1998, CH Resources, Inc. 
(Resources) filed an Application for Determination of Exempt Wholesale 
Generator Status pursuant to Section 32(a)(1) of the Public Utility 
Holding Company Act of 1935, all as more fully explained in the 
Application.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

6. Gauley River Power Partners, L.P.

[Docket No. EG99-31-000]

    Take notice that on December 8, 1998, Gauley River Power Partners, 
L.P. (GRPP) filed an application for determination of exempt wholesale 
generator status pursuant to Section 365 of the Commission's 
regulations.
    GRPP, a Vermont limited partnership, is an indirect wholly-owned 
subsidiary of Catamount Energy Corporation, which in turn is a wholly-
owned subsidiary of Central Vermont Public Service Corp., both Vermont 
corporations.
    GRPP will operate, indirectly through a Catamount Operations, Inc., 
an affiliate as defined in Section 2(a)(11)(B) of the Public Utility 
Holding Act of 1935, a hydroelectric project with an installed 
nameplate capacity of 80 MW to be located on the Gauley River in 
Nicholas County, West Virginia and owned by the City of Summersville, 
West Virginia. The Facility consists of one penstock, 17 feet in 
diameter, connected to the existing outlet of one Howell-Bunger valve 
conduit of the Army Corps of Engineers' Summersville Dam, a powerhouse 
containing two 40 MW Francis hydraulic turbines; a valve house with one 
Howell-Bunger valve, and a trailrace. The Facility will also include a 
step-up transformer, associated breakers and metering equipment and an 
approximately 10-mile-long 69 kV transmission line that is required to 
connect the Facility to the transmission system of the Appalachian 
Power Company.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

[[Page 492]]

7. Catamount Operations, Inc.

[Docket No. EG99-32-000]

    Take notice that on December 8, 1998, Catamount Operations, Inc. 
(COI) filed an application for determination of exempt wholesale 
generator status pursuant to Part 365 of the Commission's regulations.
    COI, a Vermont corporation, is owned by Catamount Energy 
Corporation, a Vermont corporation, and Gauley River Power Partners, 
L.P., a Vermont limited partnership and indirect wholly-owned 
subsidiary of Catamount Energy Corporation. Catamount Energy 
Corporation is a wholly-owned subsidiary of Central Vermont Public 
Service Corp., also a Vermont corporation.
    COI will operate a hydroelectric project with an installed 
nameplate capacity of 80 MW to be located on the Gauley River in 
Nicholas County, West Virginia and owned by the City of Summersville, 
West Virginia. The Facility consists of one penstock, 17 feet in 
diameter, connected to the existing outlet of one Howell-Bunger valve 
conduit of the Army Corps of Engineers' Summersville Dam; a powerhouse 
containing two 40 MW Francis hydraulic turbines; a valve house with one 
Howell-burger valve; and a tailrace. The Facility will also include a 
step-up transformer, associated breakers and metering equipment and an 
approximately 10-mile-long 69 kV transmission line that is required to 
connect the Facility to the transmission system of the Appalachian 
Power Company.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

8. Energy East South Glens Falls, LLC

[Docket No. EG99-33-000]

    On December 8, 1998, Energy East South Glens Falls, LLC, 
(applicant) having an address at 2 Court Street, Binghamton, New York 
13901, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    The applicant is a limited liability company that will be engaged 
directly and exclusively in the business of owning or operating, or 
both owning and operating, an eligible facility in South Glens Falls, 
New York. The facility will consist of a 60-MW, combined-cycle 
cogenerating facility fueled primarily by natural gas. The facility 
will include such interconnection components as are necessary to 
interconnect the facility with Niagara Mohawk Power Corporation.
    Comment date: December 31, 1998, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

9. FPL Energy Maine Hydro LLC

[Docket No. EG99-35-000]

    Take notice that on December 11, 1998, FPL Energy Maine Hydro LLC 
of 700 Universe Blvd., Juno Beach, Florida 33408, filed with the 
Federal Energy Regulatory Commission, an application for determination 
of exempt wholesale generator status pursuant to Part 365 of the 
Commission's regulations.
    FPL Energy Maine Hydro LLC, a Delaware limited liability company, 
proposes to acquire, own and operate 21 licensed hydroelectric 
projects, one exempt hydroelectric project, and seven storage projects 
located in the State of Maine and to sell electric energy at wholesale. 
The facilities are currently owned by Central Maine Power Company and 
its affiliates. The Maine Public Utilities Commission has issued an 
order finding that allowing the facilities to be eligible facilities 
will benefit consumers, is in the public interest and does not violate 
state law (Central Maine Power Company, Docket No. 98-058, November 25, 
1998).
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

10. FPL Energy Mason LLC

[Docket No. EG99-36-000]

    Take notice that on December 11, 1998, FPL Energy Mason LLC of 700 
Universe Blvd., Juno Beach, Florida 33408, filed with the Federal 
Energy Regulatory Commission, an application for determination of 
exempt wholesale generator status pursuant to Part 365 of the 
Commission's regulations.
    FPL Energy Mason LLC, a Delaware limited liability company, 
proposed to own and operate the Mason Station, consisting of five oil-
fired steam units in Wiscasset, Maine. The units currently are owned by 
Central Maine Power Company. The Maine Public Utilities Commission has 
found that allowing these facilities to be eligible facilities will 
benefit consumers, is in the public interest and does not violate state 
law (Central Maine Power Company, Docket No. 98-058, November 25, 
1998).
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

11. FPL Energy Wyman LLC

[Docket No. EG99-37-000]

    Take notice that on December 11, 1998, FPL Energy Wyman LLC of 700 
Universe Blvd., Juno Beach, Florida 33408, filed with the Federal 
Energy Regulatory Commission, an application for determination of 
exempt wholesale generator status pursuant to Part 365 of the 
Commission's regulations.
    FPL Energy Wyman LLC, a Delaware limited liability company, 
proposed to own and operate the W.F. Wyman Station Units 1, 2 and 3 
located in Yarmouth, Maine. The units are currently owned by Central 
Maine Power Company. The Maine Public Utilities Commission has found 
that allowing these facilities to be eligible facilities will benefit 
consumers, in the public interest and does not violate state law 
(Central Maine Power Company, Docket No. 98-058, November 25, 1998.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

12. FPL Energy Wyman IV LLC

[Docket No. EG99-38-000]

    Take notice that on December 11, 1998, FPL Energy Wyman IV LLC of 
700 Universe Blvd., Juno Beach, Florida 33408, filed with the Federal 
Energy Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
regulations.
    FPL Energy Wyman IV LLC is a Delaware limited liability company and 
proposed to acquire a 59.1547 percentage interest in the W.F. Wyman 
Unit 4 generating facility located in Yarmouth, Maine. The interest is 
currently owned by Central Maine Power Company. The Maine Public 
Utilities Commission has found that allowing the facility to be an 
eligible facility will benefit consumers, is in the public interest and 
does not violate state law (Central Maine Power Company, Docket No. 98-
058, November 25, 1998.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

[[Page 493]]

13. FPL Energy AVEC LLC

[Docket No. EG99-39-000]

    Take notice that on December 11, 1998, FPL Energy AVEC LLC of 700 
Universe Blvd., Juno Beach, Florida 33408, filed with the Federal 
Energy Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
regulations.
    FPL Energy AVEC LLC, a Delaware limited liability company, proposes 
to indirectly own and operate a 31 MW biomass facility located in Fort 
Fairfield, Maine through the purchase of all of the outstanding common 
stock of the Aroostook Valley Electric Company. The Aroostook Valley 
Electric Company is currently owned by Central Maine Power Company. The 
Maine Public Utilities Commission has found that allowing the biomass 
generating facility to be an eligible facility will benefit consumers, 
is in the public interest and does not violate state law (Central Maine 
Power Company, Docket No. 98-058, November 25, 1998.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

14. Aroostook Valley Electric Company

[Docket No. EG99-40-000]

    Take notice that on December 14, 1998, Aroostook Valley Electric 
Company (AVEC), 83 Edison Drive, Augusta, Maine 04336 filed with the 
Federal Energy Regulatory Commission an application for determination 
of exempt wholesale generator status pursuant to Part 365 of the 
Commission's regulations.
    AVEC is a Maine corporation and a subsidiary of Central Maine Power 
Company which owns and operates a 31 MW wood-fired generating facility 
located in Fort Fairfield, Maine. AVEC will become a wholly-owned 
subsidiary of FPL Energy AVEC LLC and sell electric energy exclusively 
at wholesale. The Maine Public Utilities Commission has found that 
allowing the biomass generating facility to be an eligible facility 
will benefit consumers, is in the public interest and does not violate 
state law. Central Maine Power Company, Docket No. 90-058, Nov. 25, 
1998.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

15. PSEG PPN Energy Company Ltd.

[Docket No. EG99-41-000]

    Take notice that on December 14, 1998, PSEG PPN Energy Company Ltd. 
(PSEG PPN), with its principal office at 608 St. James Court, St. Denis 
Street, Port Louis, Mauritius filed with the Federal Energy Regulatory 
Commission an application for determination of exempt wholesale 
generator status pursuant to Part 365 of the Commission's regulations.
    PSEG PPN is a company organized under the laws of Mauritius. PSEG 
PPN will be engaged, directly or indirectly through an affiliate as 
defined in Section 2(a)(11)(B) of the Public Utility Holding Company 
Act of 1935, exclusively in owning, or both owning and operating a gas 
and/or naphtha-fired combined cycle generating facility consisting of 
one electric generating unit with a nameplate rating of approximately 
347 megawatts and incidental facilities located in Tamil Nadu, India; 
selling electric energy at wholesale and engaging in project 
development activities with respect thereto.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

16. Morgan Generation Company LLC, Brush Generation Company LLC

[Docket No. EG99-42-000]

    On December 15, 1998, Morgan Generation Company LLC, (Morgan), 1001 
Louisiana Street, Houston, Texas 77002, and Brush Generation Company 
LLC (Brush), 1001 Louisiana Street, Houston, Texas 77002 (collectively 
Applicants) filed with the Federal Energy Regulatory Commission 
(Commission) an application for determination of exempt wholesale 
generator status pursuant to Part 365 of the Commission's regulations.
    Morgan intends to acquire 99 percent of the partnership interests 
in Colorado Power Partners (CPP), a Colorado general partnership which 
owns the Brush 1 cogeneration facility located in Brush, Colorado. The 
remaining one percent interest will be acquired by Brush. Upon 
acquisition of the interests in CPP by Morgan and Brush, the Brush 1 
facility will be engaged exclusively in the generation of electric 
energy for sale at wholesale. The Brush 1 facility is a topping cycle 
cogeneration facility consisting of two 25 megawatt (MW) gas turbines, 
a heat recovery steam generator, a 30 MW extraction-condensing steam 
turbine, a waste-heat steam boiler, a steam-heat exchanger and waste-
heat hot water boilers. Upon acquisition of the interests in CPP by 
Applicants, the Brush 1 Facility will be operated by Colorado Cogen 
Operators Limited Liability Company pursuant to an operation and 
maintenance agreement.
    No rate or charge for, or in connection with, the construction of 
the Brush 1 facility, or for electric energy produced thereby (other 
than any portion of a rate or charge which represents recovery of the 
cost of a wholesale rate or charge), was in effect under the laws of 
any State of the United States on October 24, 1992. Copies of this 
application have been served upon the Public Service Company of 
Colorado and the Securities and Exchange Commission.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

17. CH Resources, Inc.

[Docket No. EG99-43-000]

    Take notice that on December 16, 1998, CH Resources, Inc. 
(Resources) filed an Application for Determination of Exempt Wholesale 
Generator Status pursuant to Part 365 of the Commission's rules as more 
fully explained in the Application.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

18. Indeck Energy Services of Olean, Inc.

[Docket No. EG99-44-000]

    On December 18, 1998, Indeck Energy Services of Olean, Inc. (Indeck 
Energy), 600 North Buffalo Grove Road, Suite 300, Buffalo Grove, 
Illinois 60089, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    Indeck Energy is a single purpose entity incorporated under the 
laws of the State of Illinois. Indeck Energy will be engaged 
exclusively in the business of operating a 79 MW eligible facility 
located in Olean, New York, and selling electric energy at wholesale, 
as these terms are defined by the Federal Energy Regulatory Commission.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration

[[Page 494]]

of comments to those that concern the adequacy or accuracy of the 
application.

19. Indeck-Olean Limited Partnership

[Docket No. EG99-45-000]

    On December 18, 1998, Indeck-Olean Limited Partnership (Indeck-
Olean), 600 North Buffalo Grove Road, Suite 300, Buffalo Grove, 
Illinois 60089, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    Indeck-Olean is a Delaware limited partnership that owns a 79 MW 
generation facility located in Olean, New York. Indeck-Olean is engaged 
directly and exclusively in the business of owning or operating, or 
both owning and operating, all or part of one or more eligible 
facilities and selling electric energy at wholesale.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

20. Saba Power Company (Private) Limited

[Docket No. EG99-46-000]

    On December 21, 1998, Saba Power Company (Private) Limited, 
(Applicant), filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to part 365 of the Commission's regulations.
    Applicant, a Pakistan limited liability corporation intends to own 
certain generating facilities in Pakistan. These facilities will 
consist of a 124.7 MW oil fired thermal electric generating facility 
located near Farouqabad, Pakistan.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

21. Tipitapa Power Company Ltd.

[Docket No. EG99-47-000]

    On December 21, 1998, Tipitapa Power Company Ltd. (Applicant), West 
Wind Building, P.O. Box 1111, Grand Cayman, Cayman Islands, B.W.I., 
filed with the Federal Energy Regulatory Commission an application for 
determination of exempt wholesale generator status pursuant to Part 365 
of the Commission's regulations.
    Applicant, a Cayman Islands Corporation, intends to build and own 
certain power generating facilities in Nicaragua. These facilities will 
consist of a 50.9 MW fuel oil fired power plant near Managua, 
Nicaragua.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

22. RockGen Energy LLC

[Docket No. EG99-48-000]

    On December 21, 1998, RockGen Energy LLC (Applicant), with its 
principal office at c/o SkyGen Energy LLC, Edens Corporate Center, 650 
Dundee Road, Suite 350, Northbrook, Illinois 60062, filed with the 
Federal Energy Regulatory Commission (Commission) an application for 
determination of exempt wholesale generator status pursuant to Part 365 
of the Commission's regulations.
    Applicant states that it will be engaged in owning and operating 
the RockGen Energy Center consisting of an approximately 525 MW natural 
gas-fired simple-cycle generation facility which will be constructed in 
either Johnstown or Christiana Township, Wisconsin. The Applicant also 
states that it will sell electric energy exclusively at wholesale.
    Comment date: January 12, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

23. Minnesota Power, Inc., Petitioner, v. Northern States Power 
Company, Respondent

[Docket No. EL99-20-000]

    Take notice that Minnesota Power, Inc. (Minnesota Power) on 
December 21, 1998, tendered for filing pursuant to Rules 206 and 209 of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.206 and 385.209, and Sections 202, 
205, 206, and 306 of the Federal Power Act, 16 U.S.C. Secs. 824a, 824d, 
824e, 825e, a Complaint and Motion To Show Cause against Northern 
States Power Company (N.P.).
    A copy of this document has been served on NSP.
    Minnesota Power is asking the FERC to enforce a FERC-approved 
settlement agreement by requiring NSP to join the Midwest ISO, or, in 
the alternative, requiring NSP to adopt the Midwest ISO tariff, or a 
MAPP regional tariff should one be approved. Additionally, Minnesota 
Power is requesting the Commission issue an Order to Show Cause 
instructing that any NSP Independent Transmission Company (ITC) must be 
developed in compliance with the Commission's ISO principles. Finally, 
Minnesota Power asks the Commission to revoke NSP's market based rate 
authority pending its participation in the Midwest ISO.
    Comment date: January 20, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

24. Ocean State Power & Ocean State Power II

[Docket Nos. ER95-530-003, ER95-533-000, ER97-1890-002, ER97-1899-000]

    Take notice that on December 18, 1998, Ocean State Power and Ocean 
State Power II (Ocean State), tendered for filing revised tariff sheets 
that reflect the settlement rates in the above referenced dockets.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

25. Ocean State Power & Ocean State Power II

[Docket Nos. ER95-530-004, ER95-533-000, ER97-1890-000, ER97-1899-000, 
ER98-1717-000, ER98-1718-000]

    Take notice that on December 18, 1998, Ocean State Power and Ocean 
State Power II (Ocean State), tendered for filing its refund compliance 
report in the above-referenced dockets.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

26. Florida Power Corporation

[Docket No. ER97-4573-002]

    Take notice that on December 16, 1998, Florida Power Corporation 
tendered for filing a refund report in compliance with the Commission's 
November 2, 1998, order approving the Settlement Agreement in Docket 
No. ER97-4573-000.
    Florida Power states that copies of its refund report have been 
served on all affected customers and interested state commissions.
    Comment date: January 6, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

27. Carolina Power & Light Company

[Docket No. ER99-950-000]

    Take notice that on December 18, 1998, Carolina Power & Light 
Company (CP&L), tendered for filing Service Agreements for Short-Term 
Firm Point-to-Point Transmission Service with Sonat Power Marketing 
L.P.; SCANA Energy Marketing, Inc., and Philadelphia Electric Company. 
Service to these Eligible Customers will be in accordance with the 
terms and conditions of Carolina Power & Light Company's Open Access 
Transmission Tariff.

[[Page 495]]

    CP&L is requesting an effective date of July 17, 1997, for the 
agreement with Sonat; an effective date of March 23, 1998, for the 
agreement with SCANA; and a date of May 26, 1998, for the agreement 
with Philadelphia.
    Copies of the filing were served upon the North Carolina Utilities 
Commission and the South Carolina Public Service Commission.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

28. Carolina Power & Light Company

[Docket No. ER99-951-000]

    Take notice that on December 18, 1998, Carolina Power & Light 
Company (CP&L), tendered for filing an executed Service Agreement with 
Tennessee Valley Authority under the provisions of CP&L's Market-Based 
Rates Tariff, FERC Electric Tariff No. 4. This Service Agreement 
supersedes the un-executed Agreement originally filed in Docket No. 
ER98-3385-000 and approved effective May 18, 1998.
    Copies of the filing were served upon the North Carolina Utilities 
Commission and the South Carolina Public Service Commission.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

29. Western Resources, Inc.

[Docket No. ER99-952-000]

    Take notice that on December 18, 1998, Western Resources, Inc. 
(Western Resources), tendered for filing agreements between Western 
Resources and Constellation Power Source Inc. Western Resources states 
that the purpose of the agreement is to permit the customer to take 
service under Western Resources' market-based power sales tariff on 
file with the Commission.
    The agreement is proposed to become effective November 23, 1998.
    Copies of the filing were served upon Constellation Power Source 
Inc., and the Kansas Corporation Commission.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

30. PacifiCorp

[Docket No. ER99-953-000]

    Take notice that on December 18, 1998, PacifiCorp, tendered for 
filing in accordance with 18 CFR 35 of the Commission's Rules and 
Regulations, the annual facilities charge calculation under, PacifiCorp 
Rate Schedule FERC No. 298.
    PacifiCorp requests that an effective date of December 31, 1998, be 
assigned to the annual facilities charge calculation.
    Copies of this filing were supplied to Southern California Edison 
Company, Pacific Gas & Electric Company, the Washington Utilities and 
Transportation Commission, the Public Utility Commission of Oregon and 
the Public Utilities Commission of the State of California.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

31. Allegheny Energy, Inc.

[Docket No. ER99-954-000]

    Take notice that on December 18, 1998, AYP Energy, Inc. (AYP), 
tendered for filing its FERC Electric Rate Schedule No. 1, as an 
Amendment to its Market Rate Tariff to permit sales to its affiliated 
companies pursuant to the Commission's directives on affiliated sales.
    AYP Energy, Inc., seeks a December 1, 1998, effective date for the 
amendment to its Market Rate Tariff.
    Copies of the filing have been provided to the Public Utilities 
Commission of Ohio, the Pennsylvania Public Utility Commission, the 
Maryland Public Service Commission, the Virginia State Corporation 
Commission, the West Virginia Public Service Commission, and all 
parties of record.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

32. PJM Interconnection, L.L.C.

[Docket No. ER99-955-000]

    Take notice that on December 18, 1998, PJM Interconnection, L.L.C. 
(PJM), tendered for filing two executed service agreements under the 
PJM Open Access Tariff.
    The effective dates of these agreements is November 20, 1998, the 
date they were executed. PJM requests a waiver of the of the 
Commission's 60-day notice requirements.
    Copies of this filing were served upon the parties to the service 
agreements.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

33. PJM Interconnection, L.L.C.

[Docket No. ER99-956-000]

    Take notice that on December 18, 1998, PJM Interconnection, L.L.C. 
(PJM), tendered for filing a notice of cancellation of Rate Schedule 
Supplement No. 123, to Rate Schedule FERC No. 20. The cancellation of 
this rate schedule, effective February 28, 1999, will terminate 
PacifiCorp Power Marketing Inc.'s (PacifiCorp), membership in PJM.
    PJM states that it served a copy of its filing on all of the 
members of PJM, including PacifiCorp, and each of the state electric 
regulatory commissions within the PJM control area.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

34. Entergy Services, Inc.

[Docket No. ER99-957-000]

    Take notice that on December 18, 1998, Entergy Services, Inc., on 
behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy 
Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, 
Inc., (collectively, the Entergy Operating Companies), tendered for 
filing a Non-Firm Point-to-Point Transmission Service Agreement and a 
Short-Term Firm Point-to-Point Transportation Agreement both between 
Entergy Services, Inc., as agent for the Entergy Operating Companies, 
and DePere Energy Marketing, Inc.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

35. Entergy Services, Inc.

[Docket No. ER99-958-000]

    Take notice that on December 18, 1998, Entergy Services, Inc., on 
behalf of Entergy Arkansas, Inc., Entergy Gulf States, Inc., Entergy 
Louisiana, Inc., Entergy Mississippi, Inc., and Entergy New Orleans, 
Inc., (collectively, the Entergy Operating Companies), tendered for 
filing a Short-Term Firm Point-to-Point Transportation Agreement 
between Entergy Services, Inc., as agent for the Entergy Operating 
Companies, and Illinois Power Company.
    Entergy Services requests that the Service Agreement be made 
effective as a rate schedule no later than December 1, 1998.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

36. The Dayton Power and Light Company

[Docket No. ER99-959-000]

    Take notice that on December 18, 1998, The Dayton Power and Light 
Company (Dayton), tendered for filing service agreements establishing 
TransAlta Energy Marketing (U.S.) Inc., as customers under the terms of 
Dayton's Open Access Transmission Tariff.
    Dayton requests an effective date of one day subsequent to this 
filing for the service agreements. Accordingly, Dayton requests waiver 
of the Commission's notice requirements.

[[Page 496]]

    Copies of this filing were served upon TransAlta Energy Marketing 
(U.S.) Inc., and the Public Utilities Commission of Ohio.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

37. The Dayton Power and Light Company

[Docket No. ER99-960-000]

    Take notice that on December 18, 1998, The Dayton Power and Light 
Company (Dayton), tendered for filing service agreements establishing 
with TransAlta Energy Marketing (U.S.) Inc., as customers under the 
terms of Dayton's Open Access Transmission Tariff.
    Dayton requests an effective date of one day subsequent to this 
filing for the service agreements. Accordingly, Dayton requests waiver 
of the Commission's notice requirements.
    Copies of this filing were served upon with TransAlta Energy 
Marketing (U.S.) Inc., and the Public Utilities Commission of Ohio.
    Comment date: January 8, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

Standard Paragraphs

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of these filings are on file with 
the Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-67 Filed 1-4-99; 8:45 am]
BILLING CODE 6717-01-P