[Federal Register Volume 64, Number 72 (Thursday, April 15, 1999)]
[Notices]
[Pages 18618-18619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-9363]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protests

April 9, 1999.
    a. Type of Application: Preliminary Permit.
    b. Project No.: P-11694-000.
    c. Date filed: March 5, 1999.
    d. Applicant: Universal Electric Power Corp.
    e. Name of Project: Kentucky L&D #4 Project.
    f. Location: At the Corps of Engineer's Kentucky L&D #4, on the 
Kentucky River, near the Town of Frankfort, Franklin County, Kentucky.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791 (a)-
825(r).
    h.  Applicant Contact: Mr. Ronald Feltenberger, Universal Electric 
Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 535-7115.
    i. FERC Contact: Any questions on this notice should be addressed 
to Michael Spencer, E-mail address at [email protected], or 
telephone (202) 219-2846.
    j. Deadline for filing motions to intervene and protest: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20526.
    The Commission's Rules and Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Project: The proposed project would utilize the 
Corps of Engineer's Kentucky L&D #4 dam and consist of the following: 
(1) two 72-inch-diameter, 50-foot-long penstocks, constructed in the 
existing outlet works; (2) a powerhouse containing two generating units 
with a combined total capacity of 2.5 MW and an estimated average 
annual generation of 15.0 Gwh; and (3) a 300-foot-long transmission 
line.
    l. Locations of the application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference and Files Maintenance Branch, located at 888 North Capitol 
Street, N.E., Room 2A, Washington, DC 20426, or by calling (202) 219-
1371. This filing may be viewed on the web at http://www.ferc.fed.us/
online/rims.htm (call (202) 208-2222 for assistance). A copy is also 
available for inspection and

[[Page 18619]]

reproduction at the address in item h above.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-9363 Filed 4-14-99; 8:45 am]
BILLING CODE 6717-01-M