[Federal Register Volume 64, Number 142 (Monday, July 26, 1999)] [Notices] [Pages 40362-40363] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-18966] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-583-000] Portland Natural Gas Transmission System; Notice of Request Under Blanket Authorization July 20, 1999. Take notice that on July 14, 1999, Portland Natural Gas Transmission System (Portland Natural Gas), One Harbour Place, Portsmouth, New Hampshire 03801, filed in Docket No. CP99-583-000 a request pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 157.211) for authorization to add a delivery point near mile post 0.48 on the Newington lateral, for G-P Gypsum Corporation (G-P Gypsum) in Newington, New Hampshire. Portland Natural Gas makes such request under its blanket certificate issued in Docket No. CP96-249-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request on file with the Commission. The filing may be viewed on the web at http://www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). Communications concerning this filing should be addressed to: J. Marc Teixiera, Vice President of Engineering and Operations, Portland Natural Gas Transmission System Operations Co., LLC, 603-427-2410. Specifically, the proposed facilities will consist of approximately 235 feet of 4-inch pipe and a metering facility, that will extend from the existing tap at the Newington lateral to a meter station to be built by G-P Gypsum, which will house the proposed metering facility. Portland Natural Gas indicates that its tariff does not prohibit the installation of the proposed facilities, and that G-P Cypsum is providing all funding for the facilities required for the proposed delivery point, so there will be no cost to Portland Natural Gas or its existing customers. It is averred that G-P Gypsum, who is presently served by Northern Utilities, Inc., a local distribution company, has constructed for 4,000 Dt of IT service from Portland Natural Gas. [[Page 40363]] It is stated that the Newington lateral is part of the Joint Facilities owned by both Portland Natural Gas and Maritimes & Northeast Pipeline, L.L.C. (Maritimes). Portland Natural Gas indicates that it has already constructed the facilities necessary for a tie-in to the Newington lateral pursuant to Commission authorization in Docket No. CP99-110-000, issued on December 31, 1998. It is therefore indicated that Portland Natural Gas will own the proposed delivery point and that Maritimes, as the operator of the Joint Facilities, will be the operator of the proposed delivery point. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Secretary. [FR Doc. 99-18966 Filed 7-23-99; 8:45 am] BILLING CODE 6717-01-M