[Federal Register Volume 70, Number 52 (Friday, March 18, 2005)]
[Notices]
[Pages 13184-13185]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E5-1180]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER03-256-004, et al.]
TXU Pedricktown Cogeneration Company LP, et al.; Electric Rate
and Corporate Filings
March 11, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. TXU Pedricktown Cogeneration Company LP
[Docket No. ER03-256-004]
Take notice that on March 8, 2005, TXU Pedricktown Cogeneration
Company LP (TXU Pedricktown) tendered for filing a compliance filing
consisting of its triennial market power update and its third revised
market-based rate schedule reflecting the incorporation of the
reporting requirement adopted by the Commission in Order No. 652 issued
February 10, 2005, Reporting Requirement for Changes in Status for
Public Utilities with Market-Based Rate Authority, 110 FERC ] 61,097
(2005).
Comment Date: 5 p.m. eastern time on March 29, 2005.
2. FirstEnergy Solutions Corp.
[Docket No. ER04-652-003]
Take notice that on March 8, 2005, FirstEnergy Solutions Corp.
(Solutions) submitted revisions to Service Schedule A-Reactive Supply
and Voltage Control from Generation Sources Service under its tariff
for sales of ancillary services
[[Page 13185]]
and interconnected operations services in compliance with the
Commission's order issued February 14, 2005 in Docket No. ER05-652-002,
et al., 110 FERC ] 61,142.
Comment Date: 5 p.m. eastern time on March 29, 2005.
3. Tucson Electric Power Company and UNS Electric, Inc.
[Docket No. ER05-610-001]
Take notice that on March 8, 2005, Tucson Electric Power Company
and UNS Electric Inc. tendered for filing revised tariff sheets as an
addendum to their joint February 18, 2005 compliance filing in Docket
No. ER05-610-000.
Comment Date: 5 p.m. eastern time on March 29, 2005.
4. WPS Energy Services, Inc.
[Docket No. ER05-686-000]
Take notice that on March 8, 2005, WPS Energy Services, Inc. (ESI)
tendered for filing a Notice of Cancellation of the brokering and
dispatch agreement between ESI and Sunbury Generation, LLC (Sunbury).
ESI requests an effective date of December 31, 2004.
ESI states that copies of the filing were served upon Sunbury.
Comment Date: 5 p.m. eastern time on March 29, 2005.
5. Total Gas & Electricity (PA), Inc.
[Docket Nos. ER05-687-000]
Take notice that on March 8, 2005, Total Gas & Electricity (PA),
Inc. (TG&E PA) tendered for filing a petition for acceptance of TG&E
PA's proposed FERC Rate Schedule No. 1; waiver of certain requirements
under Subparts B and C of Part 35 of the regulations; and the granting
of blanket approvals normally accorded to sellers at market-based
rates. TG&E PA states that it intends to act as a power marketer and
that it and its affiliates do not own or control any electric
generation facilities, transmission facilities, or any inputs to
generation and does not have any franchised electric utility
affiliates.
Comment Date: 5 p.m. eastern time on March 29, 2005.
6. Southwest Power Pool, Inc.
[Docket No. ER05-688-000]
Take notice that on March 8, 2005, Southwest Power Pool, Inc. (SPP)
submitted for filing a letter agreement between Southwestern Public
Service Company d/b/a Xcel Energy (Xcel) and Wildorado Wind, LP
(Wildorado) (collectively, Parties) providing for the performance of
certain engineering and design activities by Xcel and the payment for
such activities by Wildorado relating to the proposed interconnection
of a generating facility to be owned and constructed by Wildorado. SPP
states that while it is not a party to the letter agreement, it is
submitting the letter agreement on behalf of the Parties as the
relevant Transmission Provider. SPP seeks an effective date of February
14, 2005.
Comment Date: 5 p.m. eastern time on March 29, 2005.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all parties to this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at http://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
[email protected], or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Linda Mitry,
Deputy Secretary.
[FR Doc. E5-1180 Filed 3-17-05; 8:45 am]
BILLING CODE 6717-01-P