[Federal Register Volume 78, Number 13 (Friday, January 18, 2013)]
[Rules and Regulations]
[Page 4070]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-00972]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0007]
Drawbridge Operation Regulations; Atlantic Intracoastal Waterway
and Biscayne Bay, Miami, FL
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviations from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued temporary deviations from the
regulations governing the operation of the following two bridges in
Miami, Florida: The Venetian Causeway Bridge (West), mile 1088.6,
across the Atlantic Intracoastal Waterway; and the Venetian Causeway
Bridge (East), across Biscayne Bay. The deviations are necessary due to
the high volume of vessel and vehicle traffic anticipated during the
Miami International Boat Show, which will be held in Miami Beach,
Florida from February 11, 2013, through February 19, 2013. These
deviations will result in the bridges opening to navigation on the hour
and half-hour before, during, and after the Miami International Boat
Show.
DATES: These deviations are effective from 7 a.m. on February 11, 2013,
through 9 p.m. on February 19, 2013.
ADDRESSES: The docket for this temporary deviation, USCG-2013-0007, is
available online by going to http://www.regulations.gov, inserting
USCG-2013-0007 in the ``Search'' box and then clicking ``Search''. The
docket is also available for inspection or copying at the Docket
Management Facility (M-30), U.S. Department of Transportation, West
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Jessica Hopkins, Seventh District
Bridge Branch, Coast Guard; telephone (305) 415-6744, email
[email protected]. If you have questions on viewing the
docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Miami International Boat Show Operations
Manager has requested temporary modifications to the operating
schedules of the Venetian Causeway Bridge (West) and the Venetian
Causeway Bridge (East) in Miami, Florida. These deviations will result
in the bridges being allowed to open on the hour and half-hour from 7
a.m. to 9 p.m. daily, from February 11, 2013, through February 19,
2013. The Miami International Boat Show generates a high volume of
vessel and vehicle traffic. In previous years, opening these bridges on
demand has resulted in significant vehicle congestion and bridge
mechanical failure. By opening the bridges on the hour and half-hour
(rather than on demand) traffic congestion will be reduced. The
temporary deviations will be effective from 7 a.m. on February 11, 2013
through 9 p.m. on February 19, 2013.
The vertical clearance, regular operating schedule, and deviation
period for each bridge are set forth below.
1. Venetian Causeway Bridge (West), mile 1088.6. The vertical
clearance of the Venetian Causeway Bridge (West), across the Atlantic
Intracoastal Waterway is 12 feet. The normal operating schedule is set
forth in 33 CFR 117.261(nn), which requires the bridge to open on
signal; except that from 7 a.m. to 7 p.m., Monday through Friday,
except Federal holidays, the bridge need only open on the hour and
half-hour.
As a result of this temporary deviation, the Venetian Causeway
Bridge (West) will only open to navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from February 11, 2013, through
February 19, 2013. At all other times the bridges will open on demand.
The bridge will also continue to open as necessary, in accordance with
33 CFR 117.31.
2. Venetian Causeway Bridge (East). The vertical clearance of the
Venetian Causeway Bridge (East), across Biscayne Bay is 6 feet. The
normal operating schedule is set forth in 33 CFR 117.269, which
requires the bridge to open on signal; except that from 7 a.m. to 7
p.m., Monday through Friday, except Federal holidays, the bridge need
only open on the hour and half-hour.
As a result of this temporary deviation, the Venetian Causeway
Bridge (East) will only open to navigation on the hour and half-hour
from 7 a.m. until 9 p.m. daily, from February 11, 2013, through
February 19, 2013. At all other times the bridges will open on demand.
The bridge will also continue to open as necessary, in accordance with
33 CFR 117.31.
In accordance with 33 CFR 117.35(e), these drawbridges must return
to their regular operating schedules immediately at the end of the
effective period of this temporary deviation. These deviations from the
operating regulations are authorized under 33 CFR 117.35.
Dated: January 8, 2013.
B. L. Dragon,
Bridge Program Director, Seventh Coast Guard District.
[FR Doc. 2013-00972 Filed 1-17-13; 8:45 am]
BILLING CODE P