[Federal Register Volume 78, Number 18 (Monday, January 28, 2013)]
[Notices]
[Pages 5797-5798]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2013-01613]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 7186-047]


Missisquoi Associates; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-project use of project lands and waters.
    b. Project No: 7186-047.
    c. Date Filed: August 31, 2012, and supplemented December 19, 2012, 
and January 17, 2013.
    d. Applicant: Missisquoi Associates.
    e. Name of Project: Sheldon Springs Hydroelectric Project.
    f. Location: Franklin County, Vermont.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kevin Webb, Hydro Licensing Manager, 
Missisquoi Associates, One Tech Drive, Suite 220, Andover, MA, 01810, 
(978) 681-1900 ext. 809.
    i. FERC Contact: Mark Carter, (678) 245-3083, [email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: February 4, 2013.
    All documents may be filed electronically via the Internet. See, 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected] or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. 
Please include the project number (P-7186-047) on any comments or 
motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Application: Missisquoi Associates requests 
Commission approval to allow its affiliate, EGP Solar 1, LLC, to 
construct and maintain a 2.2 megawatt solar photovoltaic system on 
approximately 12 acres of land within the project boundary of the 
Sheldon Springs project. The solar array would be constructed on both 
sides of Heather Lane (the project's access road), but public access 
through the site on Heather Lane would remain unobstructed. The 
majority of the area proposed to be used for the solar array is 
currently devoid of trees, although some grading and tree cutting is 
proposed.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-7186) to access the document. You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email [email protected], for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the 
address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received

[[Page 5798]]

on or before the specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) Bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: January 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-01613 Filed 1-25-13; 8:45 am]
BILLING CODE 6717-01-P