[Federal Register Volume 81, Number 13 (Thursday, January 21, 2016)]
[Notices]
[Page 3408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01123]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14702-000]


Twain Resources, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On August 25, 2015, Twain Resources, LLC, filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Scheelite Water Power 
Project (Scheelite Project or project) to be located along Pine Creek, 
near the City of Bishop, in Inyo County, California. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) An intake 
receiving the water discharge from the Tungstar Redux Water Power 
Project; (2) an18-inch-diameter, approximately 6,500-foot-long steel 
penstock, conveying water to; (3) a powerhouse containing a single 810-
kilowatt impulse turbine and an 840 kilovolt-ampere generator; (4) a 
new substation at the powerhouse; (5) an approximately 600-foot-long, 
12-kilovolt (kV) transmission line connecting the substation to a 12-kV 
California Edison-owned transmission line; and (6) appurtenant 
facilities. The estimated annual generation of the Scheelite Project 
would be 4,860 megawatt-hours.
    Applicant Contact: Mr. Doug Hicks, 280 Floreca Way, Reno, Nevada 
89511, phone (775) 997-3429.
    FERC Contact: Joseph Hassell; phone: (202) 502-8079.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14702-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14702) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01123 Filed 1-20-16; 8:45 am]
 BILLING CODE 6717-01-P