[The Regulatory Plan and Unified Agenda of Federal Regulatory and Deregulatory Actions]
[Federal Energy Regulatory Commission Semiannual Regulatory Agenda
]
[From the U.S. Government Printing Office, www.gpo.gov]
-----------------------------------------------------------------------
Part LI
Federal Energy Regulatory Commission
-----------------------------------------------------------------------
Semiannual Regulatory Agenda
[[Page 74230]]
FEDERAL ENERGY REGULATORY COMMISSION (FERC)
_______________________________________________________________________
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Ch. I
Semiannual Regulatory Agenda
AGENCY: Federal Energy Regulatory Commission, DOE.
ACTION: Semiannual regulatory agenda.
_______________________________________________________________________
SUMMARY: In accordance with guidance issued by the Office of Management
and Budget (OMB), the Federal Energy Regulatory Commission voluntarily
submits information about rulemakings under development. Of the 47
rulemakings listed, 27 are current or projected rulemakings, and 20 are
completed actions.
DATES: The dates provided represent goals, not commitments, and may be
revised due to shifts in workload, changes in priorities, or extensive
public comments. See the various dates listed for each specific
rulemaking.
ADDRESSES: Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
FOR FURTHER INFORMATION CONTACT: Person listed for each specific
rulemaking.
Dated: September 11, 2006.
Magalie R. Salas,
Secretary.
Federal Energy Regulatory Commission--Long-Term Actions
----------------------------------------------------------------------------------------------------------------
Regulation
Sequence Title Identifier
Number Number
----------------------------------------------------------------------------------------------------------------
3947 Electronic Tariff Filings............................................................. 1902-AC19
3948 Standard of Review for Proposed Changes to Market-Based Rate Contracts for Wholesale 1902-AC29
Sales of Electric Energy by Public Utilities..........................................
3949 Market-Based Rates for Wholesales Sales of Electric Energy, Capacity and Ancillary 1902-AC51
Services by Public Utilities..........................................................
3950 Accounting and Financial Reporting for Public Utilities Including RTOs................ 1902-AC68
3951 Standards for Business Practices and Communication Protocols for Public Utilities..... 1902-AC75
3952 Imbalance Provisions for Intermittent Resources Assessing the State of Wind Energy in 1902-AC76
Wholesale Electricity Markets.........................................................
3953 Electronic Filing of Interlocking Positions and Twenty Largest Purchasers Information. 1902-AC77
3954 Generator Run Status Information...................................................... 1902-AC79
3955 Information Requirements for Available Transfer Capability............................ 1902-AC81
3956 Modification of Natural Gas Reporting Regulations..................................... 1902-AC89
3957 Promoting Transmission Investment Through Pricing Reform.............................. 1902-AC95
3958 Long-Term Firm Transmission Rights in Organized Electricity Markets; Long-Term 1902-AC97
Transmission Rights in Markets Operated by Regional Transmission Organization and
Independent System Operators..........................................................
3959 New PURPA Section 210(m) Regulations Applicable to Small Power Production and 1902-AC99
Cogeneration Facilities...............................................................
3960 Policy Statement on Enforcement....................................................... 1902-AD00
3961 Order Revising Market-Based Rate Tariffs and Authorization............................ 1902-AD01
3962 Preventing Undue Discrimination and Preference in Transmission Services............... 1902-AD02
3963 Rate Regulation of Certain Underground Storage Facilities............................. 1902-AD03
3964 Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public 1902-AD05
Utility Holding Company Act of 2005...................................................
3965 Transaction Subject to FPA Section 203................................................ 1902-AD07
3966 Standard of Review for Modifications to Jurisdictional Agreements..................... 1902-AD08
3967 Conditions for Public Utility Market-Based Rate Authorization Holders................. 1902-AD10
3968 Revision of Regulations to Require Reporting of Damage to Natural Gas Pipeline 1902-AD12
Facilities............................................................................
3969 Regulations Implementing the Energy Policy Act of 2005: Coordinating the Processing of 1902-AD13
Federal Authorizations for Applications Under Sections 3 and 7 of the Natural Gas Act
and Maintaining a Complete............................................................
3970 Revisions to the Blanket Regulations and Clarification Regarding Rates................ 1902-AD14
3971 Financial Accounting, Reporting and Records Retention Requirements Under the Public 1902-AD15
Utility Holding Company Act of 2005...................................................
3972 Regulations for Filing Applications for Permits to Site Interstate Electric 1902-AD16
Transmission Corridors................................................................
3973 Commission Procedures During Periods of Emergency Requiring Activation of Continuity 1902-AD19
of Operations Plan....................................................................
----------------------------------------------------------------------------------------------------------------
Federal Energy Regulatory Commission--Completed Actions
----------------------------------------------------------------------------------------------------------------
Regulation
Sequence Title Identifier
Number Number
----------------------------------------------------------------------------------------------------------------
3974 Standards of Conduct for Transmission Providers....................................... 1902-AC07
3975 Standardization of Small Generator Interconnection Agreements and Procedures.......... 1902-AC26
3976 Natural Gas Pipelines Negotiated Rate Policies and Practices.......................... 1902-AC28
3977 Standards for Business Practices of Interstate Natural Gas Pipelines.................. 1902-AC63
[[Page 74231]]
3978 Interconnection for Wind Energy and Other Alternative Technologies.................... 1902-AC65
3979 Electronic Reporting of Shortages and Anticipated Shortages of Electric Energy and 1902-AC69
Capacity..............................................................................
3980 Modification of Nuclear Plant Decommissioning Trust Fund Guidelines................... 1902-AC78
3981 Commission Authorization to Hold Interlocking Directorates............................ 1902-AC80
3982 Electronic Filing of the Application for Authorization for the Issuance of Securities 1902-AC83
or the Assumption of Liabilities......................................................
3983 Five Year Review of Oil Pipeline Pricing Index........................................ 1902-AC88
3984 Revision of FERC Form No. 73, Oil Pipeline Data Filing Instructions................... 1902-AC92
3985 Procedures for Disposition of Contested Audit Matters................................. 1902-AC93
3986 Amendments to Codes of Conduct for Unbundled Sales Service and for Person Holding 1902-AC96
Blanket Marketing Certificates........................................................
3987 Update of the Federal Energy Regulatory Commission's Fees Schedule for Annual Charges 1902-AC98
for the Use of Government Lands.......................................................
3988 Rules Concerning Certification of the Electric Reliability Organization; and 1902-AD04
Procedures for the Establishment, Approval, and Enforcement of Electric Reliability
Standards.............................................................................
3989 Revision of Rules of Practices and Procedure Regarding Issue Identification........... 1902-AD06
3990 Revised Regulations Governing Small Power Production and Cogeneration Facilities...... 1902-AD09
3991 Revisions to Record Retention Requirements for Unbundled Sales Service, Persons 1902-AD11
Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate
Authorization Holders.................................................................
3992 Conditions for Public Utility Market-Based Rate Authorization Holders................. 1902-AD17
3993 Annual Update of Filing Fees.......................................................... 1902-AD18
----------------------------------------------------------------------------------------------------------------
_______________________________________________________________________
Federal Energy Regulatory Commission (FERC) Long-Term Actions
_______________________________________________________________________
3947. ELECTRONIC TARIFF FILINGS
Priority: Substantive, Nonsignificant
Legal Authority: OMB Circular A-130
CFR Citation: 18 CFR 131; 18 CFR 154; 18 CFR 157; 18 CFR 35; 18 CFR
250; 18 CFR 341; 18 CFR 344; 18 CFR 346; 18 CFR 348; 18 CFR 385; 18 CFR
281; 18 CFR 284; 18 CFR 300; 18 CFR 347; 18 CFR 375
Legal Deadline: Other, Statutory, October 21, 2003, Government
Paperwork Elimination Act.
Abstract: The Commission proposes to revise its regulations to provide
that public utilities file tariffs and tariff revisions electronically.
(Docket No. RM01-5-000.)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Notice of Inquiry 03/20/01 66 FR 15673
NPRM 07/23/04 69 FR 43929
NPRM Comment Period End 10/04/04
Notice of Additional Proposals
and Procedures 07/15/05 70 FR 40941
Notice of Additional Proposals-
Comment Period End 08/12/05
Notice of Comment Deadline 03/08/06 71 FR 11614
Final Comment Period End 05/30/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: H. Keith Pierce, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426
Phone: 202 502-8525
Email: [email protected]
RIN: 1902-AC19
_______________________________________________________________________
3948. STANDARD OF REVIEW FOR PROPOSED CHANGES TO MARKET-BASED RATE
CONTRACTS FOR WHOLESALE SALES OF ELECTRIC ENERGY BY PUBLIC UTILITIES
Priority: Substantive, Nonsignificant
Legal Authority: 5 USC 601; 15 USC 717 to 717w; 15 USC 3301 to 3432; 16
USC 792 to 825y; 16 USC 2601 to 2645; 42 USC 4321 to 4361; 42 USC 7101
to 7352
CFR Citation: 18 CFR 2
Legal Deadline: None
Abstract: The Commission proposes to adopt a policy statement on the
standard of review to be met to justify proposed changes in market-
based rate contracts for wholesale sales of electric energy by public
utilities in light of Mobile-Sierra doctrine. (Docket No. PL02-7-000.)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Notice of Proposed Policy
Statement 08/08/02 67 FR 51516
Next Action Undetermined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Shaheda Sultan, Staff Attorney, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8845
Email: [email protected]
RIN: 1902-AC29
[[Page 74232]]
_______________________________________________________________________
3949. MARKET-BASED RATES FOR WHOLESALES SALES OF ELECTRIC ENERGY,
CAPACITY AND ANCILLARY SERVICES BY PUBLIC UTILITIES
Priority: Other Significant. Major status under 5 USC 801 is
undetermined.
Unfunded Mandates: Undetermined
Legal Authority: 16 USC 791 to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 35
Legal Deadline: None
Abstract: The Commission is proposing to codify, and in some respects
revise, its current standards to obtain market-based rate authority for
sales of energy, capacity and ancillary services. (Docket No. RM04-7-
000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Initiation of Rulemaking
Proceeding on Market-Based Rates
and Notice of Technical
Conference 04/22/04 69 FR 21777
Notice Inviting Comments Subject
to Technical Conference 02/18/05 70 FR 8358
Comment Period End 03/14/05
NPRM 06/07/06 71 FR 33102
NPRM Comment Period End 08/07/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: Undetermined
Government Levels Affected: None
Agency Contact: Elizabeth Arnold, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8818
Email: [email protected]
RIN: 1902-AC51
_______________________________________________________________________
3950. ACCOUNTING AND FINANCIAL REPORTING FOR PUBLIC UTILITIES INCLUDING
RTOS
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352; 42 USC 7651 to 7651o
CFR Citation: 18 CFR 101
Legal Deadline: None
Abstract: The Commission amended its regulations to update the
accounting requirements for public utilities and licensees, including
independent system operators and regional transmission organizations
(collectively referred to as RTOs). The Commission also amended its
financial reporting requirements for the quarterly and annual financial
reporting forms for these entities. (Docket No. RM04-12-000.)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Notice of Inquiry 09/29/04 69 FR 58112
Comment Period End 11/04/04
NPRM 06/27/05 70 FR 36865
NPRM Comment Period End 08/26/05
Final Rule 12/30/05 70 FR 77627
Order on Rehearing 05/16/06 71 FR 28513
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Lodie White, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-6193
Email: [email protected]
RIN: 1902-AC68
_______________________________________________________________________
3951. STANDARDS FOR BUSINESS PRACTICES AND COMMUNICATION PROTOCOLS FOR
PUBLIC UTILITIES
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 35; 18 CFR 37; 18 CFR 38
Legal Deadline: None
Abstract: The Commission is amending its regulations to incorporate by
reference standards promulgated by the North American Energy Standards
Board's (NAESB's) Wholesale Electric Quadrant (WEQ) dealing with: Open
Access Same-Time Information Systems (OASIS) business practice
standards, OASIS Standards and Communication Protocols and Data
Dictionary; and business practice standards for Coordinate Interchange,
Area Control Error (ACE) Equation Special Cases, Manual Time Error
Correction, and Inadvertent Interchange Payback. (Docket No. RM05-5-
000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 05/17/05 70 FR 28222
NPRM Comment Period End 07/01/05
Final Rule 05/04/06 71 FR 26199
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Gary Cohen, Attorney Advisor, Office of the General
Counsel, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426
Phone: 202 502-8321
Email: [email protected]
RIN: 1902-AC75
_______________________________________________________________________
3952. IMBALANCE PROVISIONS FOR INTERMITTENT RESOURCES ASSESSING THE
STATE OF WIND ENERGY IN WHOLESALE ELECTRICITY MARKETS
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 35
Legal Deadline: None
Abstract: The Commission proposes to amend its regulations to require
public utilities to append to their open access transmission tariffs
(OATTs) an intermittent generator imbalance service schedule.
(Docket Nos. RM05-10-000 and AD04-13-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 04/26/05 70 FR 21349
NPRM Comment Period End 05/26/05
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Jignasa Gadani, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20735
Phone: 202 502-8608
RIN: 1902-AC76
[[Page 74233]]
_______________________________________________________________________
3953. ELECTRONIC FILING OF INTERLOCKING POSITIONS AND TWENTY LARGEST
PURCHASERS INFORMATION
Priority: Info./Admin./Other
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 45; 18 CFR 46; 18 USC 131
Legal Deadline: None
Abstract: The Commission proposes to revise its regulations for filings
by persons holding interlocking positions and for utilities listing
their twenty largest purchasers of electricity. The proposed revisions
provide for electronic filing.
(Docket No. RM05-13-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 06/17/05 70 FR 35184
NPRM Comment Period End 08/16/05
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Joseph C. Lynch, Attorney Advisor, Office of the
General Counsel, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426
Phone: 202 502-8497
Email: [email protected]
RIN: 1902-AC77
_______________________________________________________________________
3954. GENERATOR RUN STATUS INFORMATION
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791 to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: Not Yet Determined
Legal Deadline: None
Abstract: The Commission seeks comments on whether the Commission
should require jurisdictional generators to provide the Commission with
confidential access to generator-run status information. (Docket No.
RM05-16-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Notice of Inquiry 06/14/05 70 FR 34468
Notice of Inquiry Comment Period
End 08/15/05
Next Action Undetermined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Joseph C. Lynch, Attorney Advisor, Office of the
General Counsel, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426
Phone: 202 502-8497
Email: [email protected]
RIN: 1902-AC79
_______________________________________________________________________
3955. INFORMATION REQUIREMENTS FOR AVAILABLE TRANSFER CAPABILITY
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 37
Legal Deadline: None
Abstract: The Commission proposes amendments to its regulations adopted
in Order Nos. 888 and 889, and to the proforma open access transmission
tariff, to ensure that transmission services are provided on a basis
that is just, reasonable and not unduly discriminatory or preferential.
(Docket No. RM05-17-000)(NOPR also includes Docket No. RM05-25-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Notice of Inquiry 06/14/05 70 FR 34417
Notice of Inquiry Comments
Period End 08/15/05
NPRM 06/06/06 71 32636
NPRM Comment Period End 09/20/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Joseph C. Lynch, Attorney Advisor, Office of the
General Counsel, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426
Phone: 202 502-8497
Email: [email protected]
RIN: 1902-AC81
_______________________________________________________________________
3956. MODIFICATION OF NATURAL GAS REPORTING REGULATIONS
Priority: Substantive, Nonsignificant
Legal Authority: 15 USC 717 to 717w; 15 USC 3301 to 3432; 42 USC 7101
to 7352; 43 USC 1331 to 1356
CFR Citation: 18 CFR 260; 18 CFR 284
Legal Deadline: None
Abstract: The Commission proposes to amend its regulations to
standardize the filing format for reporting natural gas service
interruptions and emergency natural gas sale, transportation and
exchange. The Commission also proposes to modernize the filing method,
develop a tracking method for filings, and develop an electronic
notification system to notify appropriate Commission staff when the
information is filed with the Commission. (Docket No. RM05-12-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 06/10/05 70 FR 33873
NPRM Comment Period End 07/25/05
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Jacqueline Holmes, Associate General Counsel for Energy
Projects, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426
Phone: 202 502-8198
Email: [email protected]
RIN: 1902-AC89
_______________________________________________________________________
3957. PROMOTING TRANSMISSION INVESTMENT THROUGH PRICING REFORM
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 35
Legal Deadline: None
Abstract: The Commission is amending its regulations to establish
incentive-based (including performance-based) rate treatments for the
transmission of electric energy in interstate commerce by public
utilities for the purpose of benefiting consumers by ensuring
reliability and reducing the cost of delivered power by reducing
[[Page 74234]]
transmission congestion (Docket No. RM06-4-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 11/29/05 70 FR 71409
Final Rule 07/31/06 71 FR 43294
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Andre Goodson, Attorney Advisor, Office of the General
Counsel, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426
Phone: 202 502-8560
Email: [email protected]
RIN: 1902-AC95
_______________________________________________________________________
3958. LONG-TERM FIRM TRANSMISSION RIGHTS IN ORGANIZED ELECTRICITY
MARKETS; LONG-TERM TRANSMISSION RIGHTS IN MARKETS OPERATED BY REGIONAL
TRANSMISSION ORGANIZATION AND INDEPENDENT SYSTEM OPERATORS
Priority: Other Significant. Major status under 5 USC 801 is
undetermined.
Unfunded Mandates: Undetermined
Legal Authority: 16 USC 791a to 825
CFR Citation: 18 CFR 40
Legal Deadline: None
Abstract: The Commission amended its regulations under the Federal
Power Act to require transmission organizations that are public
utilities with organized electricity markets to make available long-
term firm transmission rights that satisfy certain guidelines adopted
by the Commission in this Final Rule. (Docket No. RM06-8-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 02/09/06 71 FR 6693
Final Rule 08/01/06 71 FR 43564
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Jeffery Dennis, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-6027
Email: [email protected]
RIN: 1902-AC97
_______________________________________________________________________
3959. NEW PURPA SECTION 210(M) REGULATIONS APPLICABLE TO SMALL POWER
PRODUCTION AND COGENERATION FACILITIES
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Unfunded Mandates: Undetermined
Legal Authority: 16 USC 781a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 292
Legal Deadline: None
Abstract: The Commission proposes to amend its regulations governing
small power production and cogeneration in response to section 1253 of
the Energy Policy Act of 2005 (EP Act 2005), which added section 210(m)
to the Public Utility Regulatory Policies Act of 1978 (PURPA). (Docket
No. RM06-10-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 01/27/06 71 FR 4532
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Samuel Higginbottom, Attorney, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8561
Email: [email protected]
RIN: 1902-AC99
_______________________________________________________________________
3960. POLICY STATEMENT ON ENFORCEMENT
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 16 USC 791a to 825r; 15 USC 717 to 717z; 15 USC 3301
to 3432; 16 USC 2601 to 2645; 42 USC 7101 to 7352; . . .
CFR Citation: None
Legal Deadline: None
Abstract: The Commission described its Policy on enforcement of
statutes, orders, rules and regulations in light of expanded civil
penalty authority under the FPA, NGA, and NGPA, and described factors
and circumstances that will be taken into account in determining
penalties. (Docket No. PL06-1-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 11/02/05 70 FR 66378
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Ted Gerarden, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-6187
Email: [email protected]
RIN: 1902-AD00
_______________________________________________________________________
3961. ORDER REVISING MARKET-BASED RATE TARIFFS AND AUTHORIZATION
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 42 USC 7101
to 7352
CFR Citation: None
Legal Deadline: None
Abstract: The Commission proposes to rescind Market Behavior Rule 2
(supplemented by regulations adopted in Docket No. RM06-3-000) and to
incorporate the provisions of Market Behavior Rules 1, 3, 4, 5, and 6
in its regulations under the Federal Power Act. (Docket No. EL06-16-
000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 11/02/05 70 FR 71484
Final Rule 02/16/06
Order Denying Rehearing 04/17/06
Next Action Undetermined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Mark Higgins, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426
Phone: 202 502-8273
Email: [email protected]
RIN: 1902-AD01
[[Page 74235]]
_______________________________________________________________________
3962. PREVENTING UNDUE DISCRIMINATION AND PREFERENCE IN TRANSMISSION
SERVICES
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 1; 18 CFR 35 ; 18 CFR 37
Legal Deadline: None
Abstract: The Commission invites comments on whether reforms are needed
to the Order No. 888 pro forma open access transmission tariff (OATT)
and the OATTs of public utilities to ensure that services thereunder
are just, reasonable and not unduly discrimination or preferential. The
Commission also invites comments on the implementation of the newly
established section 211A of the Federal Power Act (concerning the
provision of open access transmission) and on section 1233 of the
Energy Policy Act of 2005, which defines native load service
obligation. (Docket No. RM05-25-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NOI 09/23/05 70 FR 55797
NPRM 05/19/06
Next Action Undetermined
Regulatory Flexibility Analysis Required: Undetermined
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: David Withnell, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE,, Washington, DC 20426
Phone: 202 502-8421
Email: [email protected]
RIN: 1902-AD02
_______________________________________________________________________
3963. RATE REGULATION OF CERTAIN UNDERGROUND STORAGE FACILITIES
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 15 USC 717 to 717w; 15 USC 3301 to 3432; 42 USC 7101
to 7352; 43 USC 1331 to 1356
CFR Citation: 18 CFR 284
Legal Deadline: None
Abstract: The Commission amended its regulations to establish criteria
for obtaining market-based rates for storage services offered under
part 284. First, the Commission proposes to modified its market-power
analysis to better reflect the competitive alternatives to storage.
Secondly, the Commission promulgated rules to implement new section
4(f) of the Natural Gas Act, to permit underground natural gas storage
service providers that are unable to show that they lack market power
to negotiate market-based rates in circumstances where market-based
rates are in the public interest and necessary to encourage the
construction of the storage capacity in the area needing storage
services, and where customers are adequately protected. (Docket No.
RM05-23-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 12/29/05 70 FR 77079
NPRM Comment Period End 02/27/06
Final Rule 06/27/06 71 FR 36612
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: Sandra Delude, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8583
Email: [email protected]
RIN: 1902-AD03
_______________________________________________________________________
3964. REPEAL OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 AND
ENACTMENT OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005
Priority: Other Significant
Legal Authority: PL No. 109-58; 1261 et seq; 119 Stat 594 (2005)
CFR Citation: 18 CFR 365; 18 CFR 366
Legal Deadline: None
Abstract: The Commission amends its regulations to implement the repeal
of the Public Utility Holding Company Act of 1935 and the enactment of
the Public Utility Holding Company Act of 2005, by adding a new
subchapter part to its regulations and removing its exempt wholesale
generator rules as they are no longer necessary. (Docket No. RM05-32-
000) (Order No. 667)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 09/23/05 70 FR 55805
Final Rule 12/20/05 70 FR 75592
Order Granting Rehearing, Order
No. 667-A 05/16/06 71 FR 28446
Order on Rehearing, Order No.
667-B 07/28/06 71 FR 42750
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: Lawrence Greenfield, Supervisory Attorney, Office of
the General Counsel, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426
Phone: 202 208-0415
RIN: 1902-AD05
_______________________________________________________________________
3965. TRANSACTION SUBJECT TO FPA SECTION 203
Priority: Other Significant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 5 USC 601; 15 USC 717 to 717w; 15 USC 3301 to 3432; 16
USC 792 to 825y; 16 USC 2601 to 2645; 42 USC 4321 to 4361; 42 USC 7101
to 7352
CFR Citation: 18 CFR 2; 18 CFR 33
Legal Deadline: None
Abstract: The Commission has amended its regulations to implement
amended section 203 of the Federal Power Act (FPA). (Docket No. RM05-
34-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 10/07/05 70 FR 58636
Final Rule 01/06/06 71 FR 1348
Order on Rehearing, Order No.
669-A 05/16/06 71 FR 29442
Order on Rehearing, Order No.
669-B 07/27/06 71 FR 42579
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: Janice MacPherson, Supervisory Attorney, Office of the
General Counsel, Federal Energy
[[Page 74236]]
Regulatory Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 208-0921
RIN: 1902-AD07
_______________________________________________________________________
3966. STANDARD OF REVIEW FOR MODIFICATIONS TO JURISDICTIONAL AGREEMENTS
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7252
CFR Citation: 18 CFR 35; 18 CFR 370
Legal Deadline: None
Abstract: The Commission proposes to amend its regulations to provide a
general rule regarding the standard of review applicable to proposed
modifications to Commission-jurisdictional agreements under the Federal
Power Act and Natural Gas Act. The intent of the proposed rulemaking is
to promote the sanctity of contracts, recognize the importance of
providing certainty and stability in competitive electric energy
markets, and provide adequate protection of energy customers. (Docket
No. RM05-35-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 01/04/06 71 FR 303
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: Shaheda Sultan, Staff Attorney, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8845
Email: [email protected]
RIN: 1902-AD08
_______________________________________________________________________
3967. CONDITIONS FOR PUBLIC UTILITY MARKET-BASED RATE AUTHORIZATION
HOLDERS
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 16 USC 2601 to 2645; 31 USC 9701;
42 USC 7101 to 7352
CFR Citation: 18 CFR 35
Legal Deadline: None
Abstract: The Commission codifies certain market behavior rules
applicable to sellers under market based rate authority with no
substantive change. (Docket No. RM06-13-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Final Rule 02/16/06
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Mark Higgins, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426
Phone: 202 502-8273
Email: [email protected]
RIN: 1902-AD10
_______________________________________________________________________
3968. [bull] REVISION OF REGULATIONS TO REQUIRE REPORTING OF DAMAGE TO
NATURAL GAS PIPELINE FACILITIES
Priority: Substantive, Nonsignificant
Unfunded Mandates: Undetermined
Legal Authority: 15 USC 717 to 717w; 15 USC 3301 to 3432; 42 USC 7101
to 7352
CFR Citation: 18 CFR 260
Legal Deadline: None
Abstract: The Commission amends its regulations to require that
jurisdiction natural gas companies report damage to facilities as the
result of a natural disaster or terrorist activity that results in a
reduction in pipeline throughput or storage deliverability. (Docket No.
RM06-18-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 06/19/06 71 FR 35226
NPRM Comment Period End 07/19/06
Final Rule 08/29/06 71 FR 51098
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: William Blome, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8426
Email: [email protected]
RIN: 1902-AD12
_______________________________________________________________________
3969. [bull] REGULATIONS IMPLEMENTING THE ENERGY POLICY ACT OF 2005:
COORDINATING THE PROCESSING OF FEDERAL AUTHORIZATIONS FOR APPLICATIONS
UNDER SECTIONS 3 AND 7 OF THE NATURAL GAS ACT AND MAINTAINING A COMPLETE
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 15 USC 717 to 717o; 15 USC 717 to 717w; 15 USC 3301 to
3432; 42 USC 7101 to 7352; 5 USC 551 to 557; 16 USC 791a to 825r; 16
USC 2601 to 2645; 28 USC 2461; 31 USC 3701; 31 USC 9701; 49 USC 60502;
49 USC 1 to 85
CFR Citation: 18 CFR 153; 18 CFR 157; 18 CFR 375
Legal Deadline: None
Abstract: The EPAct Section 313 amends NGA section 15 to give FERC more
authority to coordinate the processing of authorizations required under
Federal law for proposed natural gas projects under NGA section 3 and 7
and maintain a complete consolidated respect to these Federal
authorizations. The Commission proposes to promulgate regulations
governing its exercise of this authority. (Docket No. RM06-1-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 05/30/06 71 FR 30632
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Gordon Wagner, Attorney Advisor, Federal Energy
Regulatory Commission, Office of the General Counsel, 888 First Street
NE., Washington, DC 20426
Phone: 202 219-0122
Email: [email protected]
RIN: 1902-AD13
_______________________________________________________________________
3970. [bull] REVISIONS TO THE BLANKET REGULATIONS AND CLARIFICATION
REGARDING RATES
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 15 USC 717 to 717w; 15 USC 3301 to 3432; 42 USC 7101
to 7352
[[Page 74237]]
CFR Citation: 18 CFR 157
Legal Deadline: None
Abstract: The Commission proposes to amend its part 157, subpart F,
blanket certification regulations to expand the scope and scale of
activities that may be undertaken pursuant to blanket authority. The
Commission proposes to expand the types of natural gas projects
permitted under blanket authority and to increase the cost limits that
apply to blanket projects. In addition, the Commission will clarify
that a natural gas company is not necessarily engaged in an unduly
discriminatory practice if it charges different customers different
rates for the same service based on the date that customers commit to
service. (Docket No. RM06-7-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 06/26/06 71 FR 36276
NPRM Comment Period End 08/25/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: Gordon Wagner, Attorney Advisor, Federal Energy
Regulatory Commission, Office of the General Counsel, 888 First Street
NE., Washington, DC 20426
Phone: 202 219-0122
Email: [email protected]
RIN: 1902-AD14
_______________________________________________________________________
3971. [bull] FINANCIAL ACCOUNTING, REPORTING AND RECORDS RETENTION
REQUIREMENTS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 5 USC 551 to 557; 15 USC 717 to 717w; 15 USC 3301 to
3432; 16 USC 791 to 825r; 16 USC 2601 to 2645; 42 USC 7101 to 7352; 42
USC 16451 to 16463
CFR Citation: 18 CFR 366 to 369; 18 CFR 375
Legal Deadline: None
Abstract: The Commission proposes to amend it regulations to further
implement PUHCA 2005. The Commission is proposing to add a Uniform
System of Accounts for centralized service companies, to add
preservation of records requirements for holding companies and service
companies, to revise Form No. 60, Annual Report for centralized
services companies, to provide for financial reporting consistent with
the proposed Uniform System of Accounts and to provide for electronic
filing of Form No. 60. (Docket No. RM06-11-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 05/16/06 71 FR 28464
NPRM Comment Period End 06/15/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Julia A. Lake, Attorney, Federal Energy Regulatory
Commission, Office of the General Counsel, 888 First Street NE.,
Washington, DC 20426
Phone: 202 502-8370
Email: [email protected]
RIN: 1902-AD15
_______________________________________________________________________
3972. [bull] REGULATIONS FOR FILING APPLICATIONS FOR PERMITS TO SITE
INTERSTATE ELECTRIC TRANSMISSION CORRIDORS
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 16 USC 824p; 42 USC 4321 to 4370a; 42 USC 7101 to 7352
CFR Citation: 18 CFR 50; 18 CFR 380
Legal Deadline: None
Abstract: The Commission proposes regulations in accordance with
section 1221 of the Energy Policy Act of 2005 to implement filing
requirements and procedures for entities seeking to construct electric
transmission facilities. (Docket No. RM06-12-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
NPRM 06/26/06 71 FR 36258
NPRM Comment Period End 08/25/06
Final Rule To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Carolyn Van DerJagt, Attorney Advisor, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8620
Email: [email protected]
RIN: 1902-AD16
_______________________________________________________________________
3973. [bull] COMMISSION PROCEDURES DURING PERIODS OF EMERGENCY REQUIRING
ACTIVATION OF CONTINUITY OF OPERATIONS PLAN
Priority: Substantive, Nonsignificant. Major status under 5 USC 801 is
undetermined.
Legal Authority: 5 USC 553; 42 USC 7101 to 7352
CFR Citation: 18 CFR 376
Legal Deadline: None
Abstract: The Commission establishes procedures with regard to filing
and other requirements if the Commission is required to implement its
Continuity of Operations Plan in response to an emergency situation
that disrupts communications to or from the Commission's headquarters
or which otherwise impairs headquarters operations. (Docket No. RM06-
19-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Final Rule 07/27/06 71 FR 42593
Order on Rehearing To Be Determined
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Federalism: Undetermined
Agency Contact: John Clements, Federal Energy Regulatory Commission,
Office of General Counsel, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8070
Email: [email protected]
RIN: 1902-AD19
[[Page 74238]]
_______________________________________________________________________
Federal Energy Regulatory Commission (FERC) Completed Actions
_______________________________________________________________________
3974. STANDARDS OF CONDUCT FOR TRANSMISSION PROVIDERS
Priority: Other Significant
CFR Citation: 18 CFR 358
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Interpretive Order 02/16/06
Regulatory Flexibility Analysis Required: No
Small Entities Affected: No
Government Levels Affected: None
Agency Contact: Demetra E. Anas
Phone: 202 502-8178
Fax: 202 208-0057
Email: [email protected]
RIN: 1902-AC07
_______________________________________________________________________
3975. STANDARDIZATION OF SMALL GENERATOR INTERCONNECTION AGREEMENTS AND
PROCEDURES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 35
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Supplemental Comments Due 7/27/206
Final Rule 06/13/05 70 FR 34189
Final Rule Effective 08/12/05
Order on Rehearing - Order No.
2006-A 11/30/05 70 FR 71760
Order on Rehearing - Order No.
2006-B 07/27/06 71 FR 42587
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Michael G. Henry
Phone: 202 502-8532
Email: [email protected]
RIN: 1902-AC26
_______________________________________________________________________
3976. NATURAL GAS PIPELINES NEGOTIATED RATE POLICIES AND PRACTICES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 284
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order Dismissing Rehearing 03/23/06
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Robert D. McLean
Phone: 202 502-8156
Email: [email protected]
RIN: 1902-AC28
_______________________________________________________________________
3977. STANDARDS FOR BUSINESS PRACTICES OF INTERSTATE NATURAL GAS
PIPELINES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 284
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule Effective 06/16/05
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Jamie Chabinsky
Phone: 202 502-6040
Email: [email protected]
RIN: 1902-AC63
_______________________________________________________________________
3978. INTERCONNECTION FOR WIND ENERGY AND OTHER ALTERNATIVE TECHNOLOGIES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 35
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule Effective 10/14/05 70 FR 47093
Regulatory Flexibility Analysis Required: No
Small Entities Affected: No
Government Levels Affected: None
Agency Contact: Bruce A. Poole
Phone: 202 502-8468
Email: [email protected]
RIN: 1902-AC65
_______________________________________________________________________
3979. ELECTRONIC REPORTING OF SHORTAGES AND ANTICIPATED SHORTAGES OF
ELECTRIC ENERGY AND CAPACITY.
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 294
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule Effective 06/16/05
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Jonathan First
Phone: 202 502-8529
Email: [email protected]
RIN: 1902-AC69
_______________________________________________________________________
3980. MODIFICATION OF NUCLEAR PLANT DECOMMISSIONING TRUST FUND
GUIDELINES
Priority: Info./Admin./Other
CFR Citation: 18 CFR 35
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule Effective 07/14/05
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: William Blome
Phone: 202 502-8426
Email: [email protected]
RIN: 1902-AC78
_______________________________________________________________________
3981. COMMISSION AUTHORIZATION TO HOLD INTERLOCKING DIRECTORATES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 45; 3 CFR 142
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order Denying Rehearing 02/16/06
Regulatory Flexibility Analysis Required: No
Small Entities Affected: No
Government Levels Affected: None
Agency Contact: Melissa Mitchell
Phone: 202 502-6038
Email: [email protected]
RIN: 1902-AC80
_______________________________________________________________________
3982. ELECTRONIC FILING OF THE APPLICATION FOR AUTHORIZATION FOR THE
ISSUANCE OF SECURITIES OR THE ASSUMPTION OF LIABILITIES
Priority: Info./Admin./Other
CFR Citation: 18 CFR 34; 18 CFR 131
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule 06/20/05 70 FR 35372
Final Rule Effective 10/01/05 70 FR 35372
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Joseph C. Lynch
Phone: 202 502-8497
Email: [email protected]
RIN: 1902-AC83
[[Page 74239]]
_______________________________________________________________________
3983. FIVE YEAR REVIEW OF OIL PIPELINE PRICING INDEX
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 342
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order Establishing Index for Oil
Price Change Ceiling Levels 03/23/06 71 FR 15329
Regulatory Flexibility Analysis Required: No
Small Entities Affected: No
Government Levels Affected: None
Agency Contact: Harris S. Wood
Phone: 202 502-8224
Email: [email protected]
RIN: 1902-AC88
_______________________________________________________________________
3984. REVISION OF FERC FORM NO. 73, OIL PIPELINE DATA FILING
INSTRUCTIONS
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 347; 18 CFR 357
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule Effective 08/15/05
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Andrew Lyon
Phone: 202 502-8637
Email: [email protected]
RIN: 1902-AC92
_______________________________________________________________________
3985. PROCEDURES FOR DISPOSITION OF CONTESTED AUDIT MATTERS
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 41; 18 CFR 158; 18 CFR 286; 18 CFR 349
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order on Rehearing, Order No.
675-A 05/24/06 71 FR 29779
Regulatory Flexibility Analysis Required: No
Small Entities Affected: No
Government Levels Affected: None
Agency Contact: John R. Kroeger
Phone: 202 502-8177
Email: [email protected]
RIN: 1902-AC93
_______________________________________________________________________
3986. AMENDMENTS TO CODES OF CONDUCT FOR UNBUNDLED SALES SERVICE AND FOR
PERSON HOLDING BLANKET MARKETING CERTIFICATES
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 284
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule 02/27/06 71 FR 9709
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Frank Karabetsos
Phone: 202 502-8133
Email: [email protected]
RIN: 1902-AC96
_______________________________________________________________________
3987. UPDATE OF THE FEDERAL ENERGY REGULATORY COMMISSION'S FEES SCHEDULE
FOR ANNUAL CHARGES FOR THE USE OF GOVERNMENT LANDS
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 11
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule 01/18/06 71 FR 2863
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Fannie Kingsberry
Phone: 202 502-6108
Email: [email protected]
RIN: 1902-AC98
_______________________________________________________________________
3988. RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY
ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND
ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS
Priority: Other Significant
CFR Citation: 18 CFR 39
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule, Order on Rehearing
03/30/2006 04/18/06 71 FR 19814
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Christy Walsh
Phone: 202 502-6523
Email: [email protected]
RIN: 1902-AD04
_______________________________________________________________________
3989. REVISION OF RULES OF PRACTICES AND PROCEDURE REGARDING ISSUE
IDENTIFICATION
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 385
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order on Rehearing 03/26/06 71 FR 14640
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Carol C. Johnson
Phone: 202 502-8521
Email: [email protected]
RIN: 1902-AD06
_______________________________________________________________________
3990. REVISED REGULATIONS GOVERNING SMALL POWER PRODUCTION AND
COGENERATION FACILITIES
Priority: Other Significant
CFR Citation: 18 CFR 131; 18 CFR 292
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Order on Rehearing 05/30/06 71 FR 30585
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Samuel Higginbottom
Phone: 202 502-8561
Email: [email protected]
RIN: 1902-AD09
_______________________________________________________________________
3991. REVISIONS TO RECORD RETENTION REQUIREMENTS FOR UNBUNDLED SALES
SERVICE, PERSONS HOLDING BLANKET MARKETING CERTIFICATES, AND PUBLIC
UTILITY MARKET-BASED RATE AUTHORIZATION HOLDERS
Priority: Substantive, Nonsignificant
CFR Citation: 18 CFR 35; 18 CFR 284
Completed:
________________________________________________________________________
Reason Date FR Cite
________________________________________________________________________
Final Rule 02/27/06 71 FR 9471
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Mark Higgins
[[Page 74240]]
Phone: 202 502-8273
Email: [email protected]
RIN: 1902-AD11
_______________________________________________________________________
3992. [bull] CONDITIONS FOR PUBLIC UTILITY MARKET-BASED RATE
AUTHORIZATION HOLDERS
Priority: Substantive, Nonsignificant
Legal Authority: 16 USC 791a to 825r; 31 USC 9701; 42 USC 7101 to 7352;
16 USC 2601 to 2645
CFR Citation: 18 CFR 35
Legal Deadline: None
Abstract: The Commission amends its regulations to include certain
rules governing the conduct of entities authorized to make sales of
electricity and related products under market-based rate
authorizations. (Docket No. RM06-13-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Final Rule 02/27/06 71 FR 9695
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Frank Karabetsos, Attorney, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-8133
Email: [email protected]
RIN: 1902-AD17
_______________________________________________________________________
3993. [bull] ANNUAL UPDATE OF FILING FEES
Priority: Substantive, Nonsignificant
Legal Authority: 15 USC 717 to 717w; 16 USC 791 to 828c; 16 USC 2601 to
2645; 31 USC 9701; 42 USC 7101 to 7352; 49 USC 60502; 49 USC 1 to 85
CFR Citation: 18 CFR 381
Legal Deadline: None
Abstract: The Commission issued an update of its filing fees. It
provides the yearly data in the Commission's Management,
Administrative, and Payroll System to calculate the new fees. The
update is to adjust the fees on the basis of the Commission's costs for
Fiscal Year 2005. (Docket No. RM06-15-000)
Timetable:
________________________________________________________________________
Action Date FR Cite
________________________________________________________________________
Final Rule 03/17/06 71 FR 13756
Regulatory Flexibility Analysis Required: No
Government Levels Affected: None
Agency Contact: Elizabeth Misiewicz, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426
Phone: 202 502-6240
Email: [email protected]
RIN: 1902-AD18
[FR Doc. 06-7773 Filed 12-08-06; 8:45 am]
BILLING CODE 6717-01-S